Premier House

RAF Group successfully delivered the Harrow Premier project, showcasing their expertise in implementing advanced glazing solutions. The installation cantered on the Comar 6EFT Curtain Walling system on the ground floor, creating an effective glass façade that maximizes natural light while maintaining thermal performance. The system’s clean lines and slim profile enhance the building’s modern design.

The integration of Comar Advanced 5Pi Tilt and Turn Windows provides practical ventilation options and maintenance access, while the 7Pi LS Sliding Doors deliver smooth operation with robust security features. All components meet current building regulations, with strong U-values and air tightness ratings. The team’s technical expertise ensured precise alignment of all glazing components, resulting in a water-tight, thermally efficient envelope that serves both function and form.

Categories: